{"id":4040,"date":"2014-05-26T13:43:54","date_gmt":"2014-05-26T18:43:54","guid":{"rendered":"http:\/\/allenbyparents.com\/blog2\/?p=4040"},"modified":"2014-05-26T13:43:54","modified_gmt":"2014-05-26T18:43:54","slug":"allenby-build-update-week-of-may-19","status":"publish","type":"post","link":"https:\/\/allenbyparents.com\/blog2\/allenby-build-update-week-of-may-19\/","title":{"rendered":"Allenby Build Update &#8211; Week of May 19"},"content":{"rendered":"<p><a href=\"http:\/\/allenbyparents.com\/blog2\/wp-content\/uploads\/2014\/05\/photo-9.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-4034\" src=\"http:\/\/allenbyparents.com\/blog2\/wp-content\/uploads\/2014\/05\/photo-9-300x225.jpg\" alt=\"photo-9\" width=\"300\" height=\"225\" srcset=\"\/blog2\/wp-content\/uploads\/2014\/05\/photo-9-300x225.jpg 300w, \/blog2\/wp-content\/uploads\/2014\/05\/photo-9-1024x768.jpg 1024w, \/blog2\/wp-content\/uploads\/2014\/05\/photo-9.jpg 2048w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>Progress is slow but steady on the outside of the school. The construction team will soon begin indoor projects over some weekends to retrofit four existing classrooms with a student washroom and sink to serve as FDK (Full Day Kindergarten) rooms in September.<\/p>\n<p><strong>IMPORTANT<\/strong>: Please be advised that there will be heavy equipment being used on the construction site on <strong>Friday, May 23 or Monday, May 26<\/strong> which will require a ramp being positioned on St. Clements for the day. Please try to <strong>avoid using St. Clements<\/strong> if at all possible. Thank you for your assistance with this request.<\/p>\n<p>For any questions on the build, please email <a title=\"communications@allenbyparents.com\" href=\"mailto:communications@allenbyparents.com\">communications@allenbyparents.com<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Progress is slow but steady on the outside of the school. The construction team will soon begin indoor projects over some weekends to retrofit four existing classrooms with a student washroom and sink to serve as FDK (Full Day Kindergarten) rooms in September. IMPORTANT: Please be advised that there will be heavy equipment being used [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[15],"tags":[325],"class_list":["post-4040","post","type-post","status-publish","format-standard","hentry","category-school-news","tag-allenby-build"],"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/allenbyparents.com\/blog2\/wp-json\/wp\/v2\/posts\/4040","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/allenbyparents.com\/blog2\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/allenbyparents.com\/blog2\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/allenbyparents.com\/blog2\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/allenbyparents.com\/blog2\/wp-json\/wp\/v2\/comments?post=4040"}],"version-history":[{"count":1,"href":"https:\/\/allenbyparents.com\/blog2\/wp-json\/wp\/v2\/posts\/4040\/revisions"}],"predecessor-version":[{"id":4041,"href":"https:\/\/allenbyparents.com\/blog2\/wp-json\/wp\/v2\/posts\/4040\/revisions\/4041"}],"wp:attachment":[{"href":"https:\/\/allenbyparents.com\/blog2\/wp-json\/wp\/v2\/media?parent=4040"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/allenbyparents.com\/blog2\/wp-json\/wp\/v2\/categories?post=4040"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/allenbyparents.com\/blog2\/wp-json\/wp\/v2\/tags?post=4040"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}